ADU design-build and garage conversions in Los Angeles

Size the unit, see a planning-level budget range and timeline, then send the brief to the team that would design and build it.

Estimate your ADU

Set the type and size to see a planning-level budget range, a rough timeline and the setback and Title 24 notes that apply.

ADU type
750 sq ft
Bedrooms
Bathrooms

Planning-level budget range

$265,000 – $375,000

Rough timeline

36–56 weeks

Design
6–10 wk
Permitting
8–16 wk
Construction
22–30 wk

Setback and Title 24 notes

  • State ADU law caps required side and rear setbacks at 4 feet for a new-construction ADU.
  • A newly built detached ADU is new construction under the 2025 Energy Code, which typically brings solar and all-electric-ready measures into the Title 24 documents.
  • Utility runs from the main house or the street are a common cost swing. They need a site visit to price.

Not a bid. This is a planning-level range, not a bid, quote or guarantee. Real cost and schedule depend on your site, utilities, soils, finishes and the reviewing agency. A written proposal follows a site visit.

How an ADU project runs in Los Angeles

Five steps take an ADU from a lot check to final inspection.

  1. 01

    Check the lot

    Confirm zoning, setbacks, easements, utilities and whether the lot is in a hillside area.

  2. 02

    Choose the ADU type and size

    Pick detached, attached, garage conversion or JADU, then size it with the estimator to see a planning-level range.

  3. 03

    Design and engineer the unit

    Develop plans, structural design and the Title 24 energy documents as one coordinated set.

  4. 04

    Submit for permit

    File the complete package with LADBS, LA County Public Works or the local city, and answer plan check corrections.

  5. 05

    Build and close out

    Complete site work, utilities, framing and finishes, then pass final inspection.

What is included

Lot and zoning check
Setbacks, utilities, easements and hillside status reviewed against state ADU law and local rules.
ADU plans
Floor plan, elevations and site plan drawn for your lot.
Structural and Title 24
Foundation and framing design plus the energy compliance documents plan check asks for.
Permit submittal
Submittal and corrections managed through approval.
Construction
Site work, utilities, framing and finishes through final inspection.

Questions we hear first

Something else? Call (323) 402-3524, Monday–Friday, 8:00 AM – 4:30 PM PT.

  • The four common routes are a detached ADU, an ADU attached to the main house, a garage conversion, and a junior ADU (JADU) created inside the existing single-family home. Which ones fit depends on your lot and zoning.

See how the pieces fit together in our design-build process, or browse project scopes.

Bring us the lot, the plans or the problem

Start with a free consultation. Upload plans, a survey or a correction sheet and we will tell you what the project needs.