Skip to content
Molinar DesignCSLB #1024641

LADBS permit and Title 24 energy packages in Los Angeles

A complete submittal moves faster than a fast one. Build the checklist for your jurisdiction and project, then hand it to us.

Build your permit checklist

Choose the jurisdiction and project type. Tick what you already have, then print the summary or send it to us.

Jurisdiction

Package readiness

0 of 16 items ready

This lists typical submittal contents. The reviewing agency sets the final requirements for each project.

Architectural sheets
Structural calculations and sheets
Title 24 energy forms
Soils, survey and site prerequisites
Agency submittal steps
Send this checklist to our team

What is included

Permit drawing set
Architectural, structural and MEP sheets formatted for the reviewing agency.
Structural calculations
Stamped calculations that match the drawings sheet for sheet.
Title 24 documents
Energy compliance forms for the 2025 Energy Code: CF1R for single-family work, NRCC for nonresidential.
Submittal and corrections
Electronic submittal, correction responses and department clearances tracked to approval.

Questions we hear first

Something else? Call (323) 402-3524, Monday–Friday, 8:00 AM – 4:30 PM PT.

  • It depends on the address. Property inside the City of Los Angeles goes to LADBS. Unincorporated areas, such as East Los Angeles, go to LA County Public Works. Cities like Pasadena, Glendale, Burbank and Santa Monica run their own building divisions.

See how the pieces fit together in our design-build process, or browse project scopes.

Bring us the lot, the plans or the problem

Start with a free consultation. Upload plans, a survey or a correction sheet and we will tell you what the project needs.